Tender preparation for project expansion from 18MW to 120 MW.
Project development, Tender Preparation.
40 MW Biomass Plant construction support
Process Engineering, Opex Efficiencies Implementation, Environmental Impact Reduction.
Zorro Thermal Power Plant, 25MW Gas Turbine.
Process Engineering, Pre-Com; Commissioning and Start-Up.
Support for the Construction of a 15M m³/d Gas Compression Plant
Process Engineering, Pre-Commissioning and Commissioning.
Construction of 100 MW Wind Farm.
Process Engineering for Pre-Com, Commissioning and Start-Up Electrical Integration.
Reliability analysis for 160MW Combined Cycle Plant.
Operational Due Diligence, Process Engineering.
Acquisition of 4 Simple Cycle Power Plants.
Operational Due Diligence Process Engineering.
Remote power generation in US Oil Pads
Installation & Set Up of Power Island in 20 Oil Pads (25MW/Pad) O&M Support.
Development of 110 MW Thermal Power Plant.
Development, Construction & Operation of 110 MW of Thermal Power.
Development of 260MW Thermal Power Plant.
Tender preparation for 260MW of thermal power (4 plants), Contract awarded.
Precommissioning + Commissioning and PeM Combined Cycle 3×1 SGT800 + HRSG (NEM) + BOP + SST600.
Ver Proyecto See Project Ver ProjetoPrecommissioning + Commissioning support for Solar Taurus 60 Gas Turbine + HRSG Rentech
Ver Proyecto See Project Ver ProjetoPrecom/Commissioning/Startup for Ensenada de Barragan Combined Cycle 870 MW 2x1 TG SGT5- 4000F (285 MW) + SST-5000 (300 MW).
Ver Proyecto See Project Ver ProjetoPrecom/Commissioning/PeM Offshore Wind Farm 496 MW Saint-Brieuc France. It consists of 62 SG 8.0-167 DD (Siemens Gamesa) turbines, on an area of 75 km2 located about 16 km from the French coast with two 2 x 300 MVA GE Renewable Energy Grid Solutions offshore substations. Commissioning of the high voltage electrical equipment, as well as the control and protection system of the 72.5 kV and 225 kV gas-insulated substation (GIS)
Ver Proyecto See Project Ver ProjetoPrecom/Commissioning/Startup Cogeneration San Lorenzo 380 MW 1 × 1 (1 TG SGT5- 4000F 285 MW), 1 HRSG (Vogt HP 467 T/h & LP 59 T/h) + 1 ST (SST 600) 97 MW, 360 T/h Steam duct LP13/LP7 Bar. Siemens PCS 7 & T3000 Control System
Ver Proyecto See Project Ver ProjetoCommissioning & PeM Combined Cycle YPF-GEN 464 MW: 1×1 (TG’s Ge 9FA.04 de 264 MW), 1 HRSG (Vogt HP & I& & LP) y 1 Tv (Ge D652) of 200 MW.
Ver Proyecto See Project Ver ProjetoCommissioning & PeM Combined Cycle Barker 236 MW: 4×1 (4 TG’s Ge LM6000 de 44 MW), 4 HRSG (Vogt HP 44 T/h & LP 18 T/h) y 1 Tv (Ge ST 7053) of 60 MW.
Ver Proyecto See Project Ver ProjetoCommissioning & PeM Combined Cycle Villa Maria 236 MW: 4×1 (4 TG’s Ge LM6000 de 44 MW), 4 HRSG (Vogt HP 44 T/h & LP 18 T/h) y 1 Tv (Ge ST 7053) of 60 MW.
Ver Proyecto See Project Ver ProjetoPrecom/Commissioning/PeM TG13 Cycle Simple San Pedro 54 MW: 1x0 SGT800 54 MW (GIS) SF6
Ver Proyecto See Project Ver ProjetoEN Commissioning & PeM Ciclo Simple Rojo 236 MW: 4×1 (4 TG’s Ge LM6000 de 44 MW), 4 HRSG (Vogt HP 44 T/h & LP 18 T/h) y 1 Tv (Ge ST 7053) of 60 MW.
Ver Proyecto See Project Ver ProjetoPrecom/Commissioning/PeM of 18 MW Biomass Plant (Santa Rosa – Corrientes): Julio Berkes Boiler 76 T/ h, HP 490 ° C/ 67 barg (superheated). Steam Turbine Siemens SST-300. Siemens PCS 7 Control System.
Ver Proyecto See Project Ver ProjetoEnvíanos tu mensaje o duda al número que figura y en menos de 24 hs te lo respondemos
Have any questions? Don't hesitate to contact us. We answer in less than 24 hs
Envie-nos sua mensagem ou pergunta para o número abaixo, te responderemos em menos de 24 horas